Free tool · Costing
Food product cost-of-goods calculator
Work out what one finished unit really costs: recipe ingredients with scrap, process yield, packaging, and labor and overhead. Then see your gross margin at a selling price, and the price you need for a target margin.
No login. Runs in your browser. Nothing is saved or sent.
Ingredients per batch
| Ingredient | Qty | Cost / unit ($) | Scrap % | Remove |
|---|---|---|---|---|
Use the unit you buy in (lb, kg, gal). Scrap % is extra material lost in handling and processing, added on top of the recipe quantity.
Batch & labor
Share of those units that come out sellable after fill loss, rejects, and QA samples.
Crew hours x rate plus a share of rent, utilities, and equipment. Use 0 to see materials only.
Packaging per unit
Columns: item, cost per finished unit ($), scrap %.
Price
What you charge your customer (retailer, distributor, or direct).
Cost per unit
- Total COGS / unit
- $0.9332
- 380 good units per batch
- Ingredients / unit
- $0.447
- $169.86 per batch
- Packaging / unit
- $0.0915
- Labor & overhead / unit
- $0.3947
- Gross margin at $1.25
- 25.3%
- $0.3168 gross profit per unit · 33.9% markup
- Price for a 35% margin
- $1.4357
- Cost divided by (1 - margin)
Where the ingredient cost goes
- Almonds (lb)$66.66 · 39.2%
- Rolled oats (lb)$61.20 · 36%
- Honey (lb)$42.00 · 24.7%
A planning estimate, not an accounting standard cost. Nothing you enter leaves your browser.
How it is calculated
- Ingredient cost per batch = sum of quantity x cost per unit x (1 + scrap %).
- Good units = units per batch x process yield %. Every per-batch cost is spread over good units, so yield losses raise the unit cost.
- Packaging per unit = sum of cost per unit x (1 + scrap %).
- COGS per unit = ingredients per good unit + packaging per unit + labor & overhead per good unit.
- Gross margin = (price - COGS) / price. Price for a target margin = COGS / (1 - target margin).
Doing this every day in Skygn
Skygn stores multi-level BOMs (recipes) with component and assembly scrap percentages, routings with work centers and rates, and revisions. Standard costs break into material, labor, overhead, and subcontract elements, and cost rolls can be previewed, run as a what-if with price overrides, or committed with an inventory revaluation posted to the ledger.
Purchase price variance and manufacturing variance reports show where actual cost moved away from standard, and a shop-floor time clock feeds approved labor into job costing.
Read the full guide: BOMs and standard costing for food manufacturers.
Frequently asked questions
- What is the difference between margin and markup?
- Margin is gross profit as a share of the selling price; markup is gross profit as a share of cost. A product that costs $1.00 and sells for $1.50 has a 33.3% margin and a 50% markup.
- Should scrap and yield both be included?
- They measure different losses. Scrap is extra raw material lost before it reaches the batch (spillage, trim, damaged bags). Yield is the share of the batch that becomes sellable units after fill loss, rejects, and samples. Leaving either out understates cost.
- What belongs in labor and overhead?
- Direct crew time at a loaded rate, plus a fair share of facility costs such as rent, utilities, equipment, and sanitation for the batch. If you use a co-packer, use their tolling fee per batch instead.
- Is my recipe saved?
- No. The calculation runs in your browser and nothing you enter is sent or stored.
Stop recalculating it in a spreadsheet
Skygn is the ERP for food & beverage and CPG brands: lots and expiry, recipes and costing, quality and recall, and trade spend in one system. One plan with every module, and a 14-day free trial.